Lead paint content (skip menu)

Lead paint violations at 1030 Boynton Avenue, Bronx

HPD lists 16 open lead paint violations at this Soundview-Bruckner-Bronx River building in the Bronx, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
16
of them class C, immediately hazardous
7
apartments named in open orders, plus 2 building-wide
11
newest lead order issued
Aug 24, 2026
lead orders on record since 2017
42

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 16 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
3JPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous1st window frame from west at north wall in the bathroomAug 24, 2026
3JPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous1st window frame from south at west wall in the 1st room from eastAug 24, 2026
9 apartments6J, 6F, 6E, 6A, 5B, 4K, 4A, 3D, 2JVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentOct 8, 2025
BuildingYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeMay 13, 2025
BuildingLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkMay 13, 2025
5EPeeling lead paint to fix (order 624)C, immediately hazardous1st door frame from south at west wall in the 3rd room from east at northJan 13, 2025
6JPeeling lead paint to fix (order 616)Owner refused more timeC, immediately hazardousNorth wall in the 4th room from eastOct 29, 2024
6JPeeling lead paint to fix (order 616)Owner refused more timeC, immediately hazardous1st door frame from east at south wall, 1st riser from north at east wall in the bathroomOct 29, 2024

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 2023483, BBL 2037150017. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 1030 Boynton Avenue. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 9 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 5 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.
  • 1 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 26 are closed.

Lead orders here, year by year

  1. 20172
  2. 20185
  3. 20226
  4. 20244
  5. 202517
  6. 20268
Closed lead orders (26)
ApartmentWhat HPD orderedClassIssuedClosed
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCJul 22, 2026Oct 6, 2026
4GPeeling lead paint to fixCMay 16, 2025Jul 15, 2025
4GPeeling lead paint to fixCMay 16, 2025Jul 15, 2025
5EPeeling lead paint to fixCJan 13, 2025Feb 20, 2025
5EPeeling lead paint to fixCJan 13, 2025Feb 19, 2025
5EPeeling lead paint to fixCJan 13, 2025Feb 19, 2025
3DPeeling lead paint to fixCApr 22, 2024Aug 13, 2024
3DPeeling lead paint to fixCApr 22, 2024Aug 13, 2024
4APeeling lead paint to fixCJan 28, 2022Jul 7, 2022
4APeeling lead paint to fixCJan 28, 2022Jul 7, 2022
4APeeling lead paint to fixCJan 28, 2022Jul 7, 2022
4APeeling lead paint to fixCJan 28, 2022Mar 3, 2022
4APeeling lead paint to fixCJan 28, 2022Mar 3, 2022
4APeeling lead paint to fixCJan 28, 2022Mar 3, 2022
6JPeeling lead paint to fixCAug 24, 2018Sep 24, 2018
6JPeeling lead paint to fixCAug 24, 2018Sep 24, 2018
6JPeeling lead paint to fixCAug 24, 2018Sep 24, 2018
6JPeeling lead paint to fixCAug 24, 2018Sep 24, 2018
6JPeeling lead paint to fixCAug 24, 2018Sep 24, 2018
2APeeling lead paint to fixCOct 30, 2017Dec 6, 2017
3GPeeling lead paint to fixCJan 17, 2017Mar 21, 2017

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.