Lead paint content (skip menu)

Lead paint violations at 3315 Hull Avenue, Bronx

HPD lists 12 open lead paint violations at this Norwood building in the Bronx, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
12
of them class C, immediately hazardous
All
apartments named in open orders
3
newest lead order issued
Feb 12, 2026
lead orders on record since 2008
37

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 12 open orders appear below.

ApartmentWhat HPD orderedClassWhereIssued
3HPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardousNorth wall, east wall, west wall in the 1st room from east at northFeb 12, 2026
2GPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st door frame from south at west wall in the bathroomOct 16, 2024
2GPeeling lead paint to fix (order 617)Not fixed when re-checkedC, immediately hazardous1st door frame from west at north wall, south wall, 1st window frame from east at south wall in the kitchenOct 16, 2024
2GPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall, south wall, east wall in the foyerOct 16, 2024
2GPeeling lead paint to fix (order 617)Not fixed when re-checkedC, immediately hazardousNorth wall, south wall in the 2nd room from east at northOct 16, 2024
2GVacant-apartment lead work not proven (order 625)Inspector could not get in to re-checkC, immediately hazardousThe whole apartmentOct 8, 2024
2GPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from eastOct 7, 2024
2GPeeling lead paint to fix (order 617)Not fixed when re-checkedC, immediately hazardous1st door frame from west at north wall, north wall, south wall, west wall in the 3rd room from eastOct 7, 2024
2GPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous2nd door frame from east at south wall in the private hallwayOct 7, 2024
2GPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousSouth wall, east wall in the foyerOct 7, 2024
2GPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardousSouth wall in the bathroomOct 7, 2024
APeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardous1st closet from south at west wall door in the 1st room from east at northNov 27, 2020

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 2018398, BBL 2033480071. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 3315 Hull Avenue. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 11 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 25 are closed.

Lead orders here, year by year

  1. 20084
  2. 20091
  3. 20101
  4. 20121
  5. 20139
  6. 20202
  7. 20228
  8. 202410
  9. 20261
Closed lead orders (25)
ApartmentWhat HPD orderedClassIssuedClosed
4BPeeling lead paint to fixCSep 26, 2022Nov 3, 2025
4BPeeling lead paint to fixCSep 26, 2022Nov 3, 2025
4BPeeling lead paint to fixCSep 26, 2022Nov 3, 2025
4BPeeling lead paint to fixCSep 26, 2022Aug 1, 2023
4BPeeling lead paint to fixCSep 26, 2022Aug 1, 2023
4BPeeling lead paint to fixCSep 26, 2022Aug 1, 2023
4BPeeling lead paint to fixCSep 26, 2022Aug 1, 2023
4BPeeling lead paint to fixCSep 26, 2022Aug 1, 2023
2EPeeling lead paint to fixCJan 31, 2020Nov 15, 2020
APeeling lead paint to fixCJun 30, 2008May 19, 2015
APeeling lead paint to fixCJun 30, 2008May 19, 2015
2CPeeling lead paint to fixCJul 14, 2008May 19, 2015
2GPeeling lead paint to fixCSep 11, 2013May 19, 2015
2GPeeling lead paint to fixCOct 7, 2013Dec 18, 2013
2GPeeling lead paint to fixCSep 12, 2013Nov 7, 2013
4HPeeling lead paint to fixCSep 12, 2013Oct 9, 2013
4HPeeling lead paint to fixCSep 11, 2013Oct 8, 2013
4HPeeling lead paint to fixCSep 12, 2013Oct 8, 2013
4HPeeling lead paint to fixCSep 12, 2013Oct 8, 2013
4HPeeling lead paint to fixCSep 12, 2013Oct 8, 2013
4HPeeling lead paint to fixCSep 12, 2013Oct 8, 2013
GPeeling lead paint to fixCFeb 19, 2008Sep 25, 2013
BSMTPeeling lead paint to fixCSep 11, 2009Sep 25, 2013
GPeeling lead paint to fixCApr 5, 2010Sep 25, 2013
5FPeeling lead paint to fixCJan 11, 2012Sep 25, 2013

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.