Lead paint content (skip menu)

Lead paint violations at 100 Avenue P, Brooklyn

HPD lists 21 open lead paint violations at this Gravesend (West) building in Brooklyn, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
21
of them class C, immediately hazardous
10
apartments named in open orders
15
newest lead order issued
Sep 25, 2025
lead orders on record since 2014
27

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 21 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
1FPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st door from north at east wall, 1st door frame from north at east wall in the foyerSep 25, 2025
2GPeeling lead paint to fix (order 617)C, immediately hazardous1st window frame from east at south wall, 1st window frame from north at east wall in the kitchenSep 11, 2023
2GPeeling lead paint to fix (order 617)C, immediately hazardous1st door from west at north wall, 1st door frame from west at north wall in the foyerSep 11, 2023
2GPeeling lead paint to fix (order 617)C, immediately hazardous1st door frame from south at west wall in the bathroomSep 11, 2023
11 apartments1F, 1G, 2K, 2J, 2H, 3K, 3F, 3C, 4K, 5D, 6CVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentSep 11, 2023
5GYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeAug 3, 2023
5GLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkAug 3, 2023
5GVacant-apartment lead work not proven (order 622)Owner says fixed, but certified lateC, immediately hazardousThe whole apartmentJun 9, 2023
5GPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st door frame from west at north wall in the foyerJun 8, 2023
3HPeeling lead paint to fix (order 617)Owner says fixed, but certified lateC, immediately hazardousEast wall in the 3rd room from north at eastDec 31, 2015
4JLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkMay 12, 2014

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 3175299, BBL 3066200001. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 100 Avenue P. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 12 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 6 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 2 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 6 are closed.

Lead orders here, year by year

  1. 20143
  2. 20153
  3. 202318
  4. 20253
Closed lead orders (6)
ApartmentWhat HPD orderedClassIssuedClosed
4KPeeling lead paint to fixCMay 15, 2025Feb 19, 2026
4KPeeling lead paint to fixCMay 15, 2025Sep 13, 2025
5DPeeling lead paint to fixCNov 24, 2015Jan 20, 2016
5DPeeling lead paint to fixCNov 24, 2015Jan 20, 2016
4HPeeling lead paint to fixCJun 3, 2014Jul 14, 2014
4HPeeling lead paint to fixCJun 3, 2014Jul 14, 2014

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.