Lead paint content (skip menu)

Lead paint violations at 313 Brightwater Court, Brooklyn

HPD lists 37 open lead paint violations at this Brighton Beach building in Brooklyn, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
37
of them class C, immediately hazardous
16
apartments named in open orders
24
newest lead order issued
Sep 5, 2025
lead orders on record since 2008
38

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 37 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
4APeeling lead paint to fix (order 616)C, immediately hazardousCeiling in the 2nd bathroom from northSep 5, 2025
4APeeling lead paint to fix (order 616)C, immediately hazardousCeiling in the 1st bathroom from northSep 5, 2025
3FPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardous1st window frame from west at north wall in the kitchenApr 2, 2025
3FPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardous1st closet from south at west wall door frame in the private hallwayApr 2, 2025
3FPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousPlace not named in the orderApr 2, 2025
6DPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall in the kitchenJan 22, 2025
6 apartments6C, 5E, 4E, 3F, 1K, 1DVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentMay 10, 2023
15 apartments1C, 1A, 2F, 2E, 2A, 3H, 3C, 4G, 4F, 4A, 5D, 5B, 6J, 6F, 6EVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentMay 3, 2023
5GYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeMay 1, 2023
5GLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkMay 1, 2023
4GPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st door from east at south wall, 1st door frame from east at south wall in the foyerDec 14, 2020
5DLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkDec 11, 2017
1ALead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkNov 17, 2014
2JPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousEast wall in the kitchenOct 1, 2008
2JPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousSouth wall, west wall in the 1st room from northOct 1, 2008
2JPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall, south wall, west wall in the 3rd room from north at westOct 1, 2008
2JPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall, south wall, east wall, west wall in the private hallwayOct 1, 2008
2JPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st door from east at south wall, 1st door frame from east at south wall, north wall, east wall in the foyerOct 1, 2008

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 3245063, BBL 3086860025. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 313 Brightwater Court. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 21 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 12 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 3 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 1 are closed.

Lead orders here, year by year

  1. 20085
  2. 20141
  3. 20151
  4. 20171
  5. 20201
  6. 202323
  7. 20256
Closed lead orders (1)
ApartmentWhat HPD orderedClassIssuedClosed
4FPeeling lead paint to fixCSep 14, 2015Dec 31, 2015

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.