Lead paint content (skip menu)

Lead paint violations at 410 Eastern Parkway, Brooklyn

HPD lists 12 open lead paint violations at this Crown Heights (South) building in Brooklyn, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
12
of them class C, immediately hazardous
All
apartments named in open orders, plus 2 building-wide
1
newest lead order issued
Jan 2, 2026
lead orders on record since 2015
46

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 12 open orders appear below.

ApartmentWhat HPD orderedClassWhereIssued
2KPeeling lead paint to fix (order 617)C, immediately hazardous1st dumb waiter from west at north wall in the private hallwayJan 2, 2026
2KPeeling lead paint to fix (order 617)C, immediately hazardous2nd window frame from east at south wall in the 1st room from eastJan 2, 2026
2KPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardous1st door frame from east at south wall, south wall in the kitchenMar 3, 2025
2KPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardous1st window frame from west at north wall in the kitchenMar 3, 2025
2KPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardous1st window frame from west at north wall in the bathroomMar 3, 2025
2KPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardous2nd door frame from west at north wall in the 1st room from east at southMar 3, 2025
2KPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousWest wall in the 1st room from east at southMar 3, 2025
2KPeeling lead paint to fix (order 624)Inspector could not get in to re-checkC, immediately hazardousBaseboard at east wall, baseboard at west wall in the private hallwayMar 3, 2025
2KPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousPlace not named in the orderMar 3, 2025
2KPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardous1st door frame from north at east wall, south wall in the foyerMar 3, 2025
BuildingYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeNov 25, 2022
BuildingLead records not handed to HPD (order 620)C, immediately hazardousBuilding paperworkNov 25, 2022

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 3032887, BBL 3012670010. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 410 Eastern Parkway. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 10 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.
  • 1 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 34 are closed.

Lead orders here, year by year

  1. 20152
  2. 20162
  3. 20179
  4. 202111
  5. 20229
  6. 202511
  7. 20262
Closed lead orders (34)
ApartmentWhat HPD orderedClassIssuedClosed
5DVacant-apartment lead work not provenCAug 15, 2025Sep 18, 2026
5DPeeling lead paint to fixCAug 14, 2025Dec 5, 2025
5DPeeling lead paint to fixCAug 14, 2025Dec 5, 2025
2MVacant-apartment lead work not provenCJul 20, 2021Jun 24, 2024
1MVacant-apartment lead work not provenBDec 2, 2022Jun 17, 2024
5LVacant-apartment lead work not provenBDec 2, 2022Jun 17, 2024
4FPeeling lead paint to fixCNov 29, 2022May 3, 2023
4FPeeling lead paint to fixCDec 2, 2022May 3, 2023
4FPeeling lead paint to fixCDec 2, 2022May 3, 2023
4FPeeling lead paint to fixCDec 2, 2022May 3, 2023
4GVacant-apartment lead work not provenBDec 2, 2022Mar 28, 2023
4FVacant-apartment lead work not provenCSep 1, 2021Mar 19, 2023
4FPeeling lead paint to fixCJul 19, 2021Sep 20, 2022
4FPeeling lead paint to fixCAug 31, 2021Sep 20, 2022
4FPeeling lead paint to fixCSep 2, 2021Sep 20, 2022
4FPeeling lead paint to fixCSep 2, 2021Sep 20, 2022
2MPeeling lead paint to fixCJul 19, 2021Apr 20, 2022
2MPeeling lead paint to fixCJul 19, 2021Apr 20, 2022
4JPeeling lead paint to fixCJul 12, 2021Aug 24, 2021
4JPeeling lead paint to fixCJul 12, 2021Aug 24, 2021
4JPeeling lead paint to fixCJul 12, 2021Aug 24, 2021
4HPeeling lead paint to fixCNov 20, 2017Feb 22, 2018
4HPeeling lead paint to fixCNov 17, 2017Dec 22, 2017
4JPeeling lead paint to fixCSep 14, 2016Oct 20, 2017
4JPeeling lead paint to fixCJan 23, 2017Apr 21, 2017
4CPeeling lead paint to fixCMar 13, 2017Apr 20, 2017
4CPeeling lead paint to fixCMar 13, 2017Apr 20, 2017
4CPeeling lead paint to fixCMar 13, 2017Apr 20, 2017
4CPeeling lead paint to fixCMar 13, 2017Apr 20, 2017
4JPeeling lead paint to fixCSep 14, 2016Mar 8, 2017
4JPeeling lead paint to fixCJan 23, 2017Feb 1, 2017
4JPeeling lead paint to fixCJan 23, 2017Feb 1, 2017
4CPeeling lead paint to fixCMay 18, 2015Jan 22, 2016
4CPeeling lead paint to fixCAug 24, 2015Dec 30, 2015

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.