Lead paint content (skip menu)

Lead paint violations at 26 Macombs Place, Manhattan

HPD lists 13 open lead paint violations at this Harlem (North) building in Manhattan, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
13
of them class C, immediately hazardous
7
apartments named in open orders, plus 2 building-wide
8
newest lead order issued
Sep 20, 2024
lead orders on record since 2004
70

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 13 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
6 apartments24, 21, 34, 53, 61, 3Vacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentSep 20, 2024
BuildingYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeSep 17, 2024
BuildingLead records not handed to HPD (order 620)C, immediately hazardousBuilding paperworkSep 17, 2024
42Peeling lead paint to fix (order 624)C, immediately hazardous1st door frame from north at east wall in the kitchenOct 12, 2023
42Peeling lead paint to fix (order 617)C, immediately hazardous1st door frame from north at east wall in the bathroomOct 12, 2023
42Peeling lead paint to fix (order 624)C, immediately hazardous1st closet from west at north wall door frame in the private hallwayOct 12, 2023
42Peeling lead paint to fix (order 624)C, immediately hazardous1st door frame from east at south wall in the 1st room from northOct 12, 2023
51Peeling lead paint to fix (order 616)Inspector could not get in to re-checkC, immediately hazardousSouth wall in the foyerJun 8, 2022

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 1060586, BBL 1020360001. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 26 Macombs Place. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 6 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 5 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.
  • 1 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 57 are closed.

Lead orders here, year by year

  1. 20042
  2. 20062
  3. 20072
  4. 20085
  5. 20095
  6. 20104
  7. 201111
  8. 20127
  9. 201317
  10. 20162
  11. 20221
  12. 20234
  13. 20248
Closed lead orders (57)

This list shows the 40 most recent closures.

ApartmentWhat HPD orderedClassIssuedClosed
35Peeling lead paint to fixCApr 11, 2016Mar 15, 2019
35Peeling lead paint to fixCApr 11, 2016Jun 20, 2018
45Peeling lead paint to fixCMay 23, 2013May 30, 2018
65Peeling lead paint to fixCJan 18, 2011Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
65Peeling lead paint to fixCJan 9, 2013Dec 1, 2016
66Peeling lead paint to fixCApr 26, 2010Oct 15, 2013
55Peeling lead paint to fixCApr 15, 2011Oct 15, 2013
55Peeling lead paint to fixCApr 15, 2011Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
66Peeling lead paint to fixCJan 7, 2013Oct 15, 2013
43Peeling lead paint to fixCMar 7, 2013May 22, 2013
43Peeling lead paint to fixCMar 7, 2013May 22, 2013
43Peeling lead paint to fixCMar 7, 2013May 22, 2013
43Peeling lead paint to fixCMar 7, 2013May 22, 2013
44Peeling lead paint to fixCDec 29, 2008May 9, 2013
44Peeling lead paint to fixCDec 29, 2008May 9, 2013
44Peeling lead paint to fixCJan 8, 2009May 9, 2013
44Peeling lead paint to fixCJan 8, 2009May 9, 2013
21Peeling lead paint to fixCApr 15, 2011May 9, 2013
55Peeling lead paint to fixCApr 15, 2011May 9, 2013
55Peeling lead paint to fixCApr 15, 2011May 9, 2013
21Peeling lead paint to fixCSep 30, 2011May 9, 2013
55Peeling lead paint to fixCApr 11, 2012May 9, 2013
55Peeling lead paint to fixCApr 11, 2012May 9, 2013
32Peeling lead paint to fixCApr 19, 2012May 9, 2013
65Peeling lead paint to fixCNov 16, 2004Mar 7, 2013
65Peeling lead paint to fixCNov 16, 2004Mar 7, 2013
24Peeling lead paint to fixCApr 25, 2006Mar 7, 2013
24Peeling lead paint to fixCApr 25, 2006Mar 7, 2013
3Peeling lead paint to fixCAug 22, 2007Mar 7, 2013
3Peeling lead paint to fixCAug 22, 2007Mar 7, 2013

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.