Lead paint content (skip menu)

Lead paint violations at 330 East 52nd Street, Manhattan

HPD lists 10 open lead paint violations at this East Midtown-Turtle Bay building in Manhattan, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
10
of them class C, immediately hazardous
All
apartments named in open orders
1
newest lead order issued
Sep 9, 2026
lead orders on record since 2026
13

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 10 open orders appear below.

ApartmentWhat HPD orderedClassWhereIssued
42Peeling lead paint to fix (order 617)C, immediately hazardous1st door frame from west at north wall in the foyerSep 9, 2026
42Peeling lead paint to fix (order 617)C, immediately hazardous1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from eastSep 9, 2026
42Peeling lead paint to fix (order 624)C, immediately hazardous1st closet from west at north wall door frame, 1st door frame from south at west wall in the private hallwaySep 9, 2026
42Peeling lead paint to fix (order 617)C, immediately hazardous1st closet from west at north wall door, west wall in the private hallwaySep 9, 2026
42Peeling lead paint to fix (order 624)C, immediately hazardous1st door frame from west at north wall in the bathroomSep 9, 2026
42Peeling lead paint to fix (order 617)C, immediately hazardousPlace not named in the orderSep 9, 2026
42Vacant-apartment lead work not proven (order 622)Owner says fixed, but certified lateC, immediately hazardousThe whole apartmentMay 26, 2026
42Peeling lead paint to fix (order 617)Owner given more timeC, immediately hazardous1st window frame from east at south wall, 1st window frame from south at west wall in the kitchenMay 22, 2026
42Peeling lead paint to fix (order 617)Owner given more timeC, immediately hazardous1st closet from south at west wall door, 1st door from south at west wall in the 1st room from eastMay 22, 2026
42Peeling lead paint to fix (order 617)Owner given more timeC, immediately hazardousCeiling in the private hallwayMay 22, 2026

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 1039663, BBL 1013440036. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 330 East 52nd Street. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 9 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 3 are closed.

Lead orders here, year by year

  1. 202613
Closed lead orders (3)
ApartmentWhat HPD orderedClassIssuedClosed
42Peeling lead paint to fixCMay 22, 2026Jun 30, 2026
42Peeling lead paint to fixCMay 22, 2026Jun 30, 2026
42Peeling lead paint to fixCApr 22, 2026May 22, 2026

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.