Lead paint content (skip menu)

Lead paint violations at 3675 Broadway, Manhattan

HPD lists 10 open lead paint violations at this Hamilton Heights-Sugar Hill building in Manhattan, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
10
of them class C, immediately hazardous
All
apartments named in open orders
3
newest lead order issued
Jul 27, 2026
lead orders on record since 2013
72

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 10 open orders appear below.

ApartmentWhat HPD orderedClassWhereIssued
6FPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardous1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from eastJul 27, 2026
6FPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousWest wall, 1st window frame from south at west wall in the 5th room from east at northJul 27, 2026
6FPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousBaseboard at north wall, baseboard at south wall in the foyerJul 27, 2026
2CVacant-apartment lead work not proven (order 622)C, immediately hazardousThe whole apartmentAug 25, 2025
2CPeeling lead paint to fix (order 617)Waiting for a re-inspectionC, immediately hazardous1st window frame from east at south wall in the 5th room from east at southAug 25, 2025
2CPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous2nd window frame from east at south wall in the 4th room from eastAug 25, 2025
2CPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall, west wall in the 4th room from eastJun 18, 2025
2CPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousSouth wall, 1st window frame from east at south wall in the kitchenJun 18, 2025
2CPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousBaseboard at north wall, baseboard at south wall, north wall, south wall in the private hallwayJun 18, 2025
4GPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardous1st radiator from north at east wall, 1st riser from north at east wall in the 6th room from eastJan 23, 2023

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 1062469, BBL 1020990029. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 3675 Broadway. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 9 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 62 are closed.

Lead orders here, year by year

  1. 20139
  2. 20154
  3. 20172
  4. 20182
  5. 20196
  6. 202015
  7. 202110
  8. 20238
  9. 202513
  10. 20263
Closed lead orders (62)

This list shows the 40 most recent closures.

ApartmentWhat HPD orderedClassIssuedClosed
2CPeeling lead paint to fixCJun 18, 2025Sep 17, 2025
2CPeeling lead paint to fixCJun 18, 2025Sep 17, 2025
2CPeeling lead paint to fixCJun 20, 2025Sep 17, 2025
4BBPeeling lead paint to fixCSep 18, 2020Aug 27, 2025
4GPeeling lead paint to fixCJun 16, 2025Aug 27, 2025
4GPeeling lead paint to fixCJun 16, 2025Aug 27, 2025
2CPeeling lead paint to fixCApr 21, 2025Jul 14, 2025
2CPeeling lead paint to fixCApr 21, 2025Jul 14, 2025
6EPeeling lead paint to fixCDec 6, 2023Jun 13, 2025
6EPeeling lead paint to fixCDec 6, 2023Jun 13, 2025
4EPeeling lead paint to fixCOct 27, 2020Jun 6, 2025
4EPeeling lead paint to fixCSep 21, 2020Jun 5, 2025
4EPeeling lead paint to fixCSep 21, 2020Jun 5, 2025
4EPeeling lead paint to fixCSep 21, 2020Jun 5, 2025
4EPeeling lead paint to fixCSep 21, 2020Jun 5, 2025
4EPeeling lead paint to fixCOct 27, 2020Jun 5, 2025
4EPeeling lead paint to fixCNov 27, 2020Jun 5, 2025
4EPeeling lead paint to fixCNov 27, 2020Jun 5, 2025
4EPeeling lead paint to fixCNov 27, 2020Jun 5, 2025
6FPeeling lead paint to fixCJan 17, 2023May 8, 2025
2GPeeling lead paint to fixCMar 26, 2020Apr 3, 2025
2GPeeling lead paint to fixCMar 26, 2020Apr 3, 2025
4BBPeeling lead paint to fixCSep 18, 2020Apr 3, 2025
4GPeeling lead paint to fixCJan 23, 2023Apr 3, 2025
4HPeeling lead paint to fixCFeb 14, 2023Nov 15, 2023
4HPeeling lead paint to fixCFeb 14, 2023Oct 10, 2023
4HPeeling lead paint to fixCFeb 14, 2023Oct 10, 2023
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
2GPeeling lead paint to fixCDec 7, 2021Apr 6, 2022
6DPeeling lead paint to fixCMar 2, 2021May 11, 2021
6DPeeling lead paint to fixCMar 2, 2021May 11, 2021
6DPeeling lead paint to fixCMar 2, 2021May 11, 2021
2GPeeling lead paint to fixCOct 24, 2019Apr 10, 2021
4EPeeling lead paint to fixCNov 12, 2020Dec 31, 2020
4EPeeling lead paint to fixCNov 12, 2020Dec 31, 2020

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.