Lead paint content (skip menu)

Lead paint violations at 507 West 171st Street, Manhattan

HPD lists 14 open lead paint violations at this Washington Heights (South) building in Manhattan. Each order is set out in plain English, newest first.

open lead paint violations
14
of them class C, immediately hazardous
9
apartments named in open orders, plus 2 building-wide
6
newest lead order issued
Sep 21, 2026
lead orders on record since 2001
42

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 14 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
61Peeling lead paint to fix (order 617)C, immediately hazardous1st window frame from east at south wall in the kitchenSep 21, 2026
61Peeling lead paint to fix (order 617)C, immediately hazardous1st door frame from north at east wall in the bathroomSep 21, 2026
21Vacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentApr 7, 2025
31Vacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentApr 7, 2025
3 apartments63, 1E, 1AVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentMar 31, 2025
BuildingYoung children: tenants not asked, or no lead check (order 619)C, immediately hazardousYearly tenant noticeMar 27, 2025
BuildingLead records not handed to HPD (order 618)C, immediately hazardousBuilding paperworkMar 27, 2025
61Peeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardousSouth wall, east wall in the kitchenMay 9, 2024
63Peeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousSouth wall in the 4th kitchen from northMay 4, 2009
63Peeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousCeiling in the 3rd bathroom from northMay 4, 2009
63Peeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousCeiling in the 2nd room from northMay 4, 2009
63Peeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousCeiling, south wall in the 1st room from northMay 4, 2009

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 1063083, BBL 1021280053. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 507 West 171st Street. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law today. Orders here from before August 2004 came under the older city lead rules it replaced; the later ones were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 7 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 5 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 1 open: young children: tenants not asked, or no lead check. The owner failed to send the yearly notice asking whether the apartment has a child under 6, or failed to check for lead hazards.
  • 1 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 28 are closed.

Lead orders here, year by year

  1. 20015
  2. 20052
  3. 20062
  4. 20075
  5. 20095
  6. 20124
  7. 20191
  8. 20237
  9. 20242
  10. 20257
  11. 20262
Closed lead orders (28)
ApartmentWhat HPD orderedClassIssuedClosed
61Peeling lead paint to fixCMay 9, 2024Jun 17, 2024
EPeeling lead paint to fixCMay 12, 2023Feb 16, 2024
EPeeling lead paint to fixCMay 12, 2023Feb 16, 2024
51Peeling lead paint to fixCMar 27, 2023Aug 27, 2023
51Peeling lead paint to fixCMar 27, 2023Aug 27, 2023
51Peeling lead paint to fixCMar 27, 2023Aug 27, 2023
61Peeling lead paint to fixCJul 20, 2023Aug 15, 2023
61Peeling lead paint to fixCJul 20, 2023Aug 15, 2023
61Peeling lead paint to fixCMar 7, 2001Jun 4, 2021
61Peeling lead paint to fixCMar 7, 2001Jun 4, 2021
62Peeling lead paint to fixCApr 30, 2001Jun 4, 2021
62Peeling lead paint to fixCApr 30, 2001Jun 4, 2021
62Peeling lead paint to fixCApr 30, 2001Jun 4, 2021
1BPeeling lead paint to fixCSep 21, 2007Jun 4, 2021
1BPeeling lead paint to fixCSep 21, 2007Jun 4, 2021
1BPeeling lead paint to fixCSep 21, 2007Jun 4, 2021
1BPeeling lead paint to fixCSep 21, 2007Jun 4, 2021
1BPeeling lead paint to fixCSep 21, 2007Jun 4, 2021
61Peeling lead paint to fixCApr 30, 2012Jun 4, 2021
61Peeling lead paint to fixCApr 30, 2012Jun 4, 2021
61Peeling lead paint to fixCApr 30, 2012Jun 4, 2021
61Peeling lead paint to fixCApr 30, 2012Jun 4, 2021
41Peeling lead paint to fixCApr 11, 2019Jul 22, 2019
23Peeling lead paint to fixCJan 27, 2005Apr 8, 2019
23Peeling lead paint to fixCJan 27, 2005Apr 8, 2019
23Peeling lead paint to fixCJan 26, 2006Apr 8, 2019
23Peeling lead paint to fixCMar 9, 2006Apr 8, 2019
25Peeling lead paint to fixCNov 4, 2009Apr 3, 2019

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.