Lead paint content (skip menu)

Lead paint violations at 608 West 192nd Street, Manhattan

HPD lists 11 open lead paint violations at this Washington Heights (North) building in Manhattan, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
11
of them class C, immediately hazardous
All
apartments named in open orders
3
newest lead order issued
Jun 8, 2026
lead orders on record since 2004
42

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 11 open orders appear below.

ApartmentWhat HPD orderedClassWhereIssued
4APeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousNorth wall, south wall, west wall in the foyerJun 8, 2026
4APeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousEast wall, west wall, 1st window frame from north at east wall in the kitchenJun 8, 2026
4APeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousCeiling in the 3rd room from eastJun 8, 2026
7EVacant-apartment lead work not proven (order 622)C, immediately hazardousThe whole apartmentMay 29, 2025
7EPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous1st window frame from north at east wall in the 4th room from northMay 28, 2025
7EPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardous1st closet from west at north wall door frame, north wall, west wall, 1st window frame from east at south wall in the 4th room from northMay 28, 2025
7EPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousPlace not named in the orderMay 28, 2025
7EPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousEast wall, west wall, 1st window frame from north at east wall in the kitchenMay 28, 2025
7EPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousEast wall, west wall in the 2nd private hallway from northMay 28, 2025
7EPeeling lead paint to fix (order 624)Owner's proof of repair rejectedC, immediately hazardous1st door frame from south at west wall in the bathroomMay 28, 2025
4CPeeling lead paint to fix (order 617)Inspector could not get in to re-checkC, immediately hazardous1st closet from north at east wall door in the private hallwayDec 23, 2008

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 1064027, BBL 1021690025. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 608 West 192nd Street. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 10 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 1 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 31 are closed.

Lead orders here, year by year

  1. 20045
  2. 20081
  3. 20103
  4. 20136
  5. 20155
  6. 20166
  7. 20183
  8. 20243
  9. 20257
  10. 20263
Closed lead orders (31)
ApartmentWhat HPD orderedClassIssuedClosed
2EPeeling lead paint to fixCMar 26, 2018Dec 19, 2025
2EPeeling lead paint to fixCMar 26, 2018Dec 19, 2025
2EPeeling lead paint to fixCMar 26, 2018Dec 19, 2025
3CPeeling lead paint to fixCJan 2, 2013Aug 26, 2025
3CPeeling lead paint to fixCJan 2, 2013Aug 26, 2025
8CPeeling lead paint to fixCAug 1, 2016Aug 26, 2025
3CPeeling lead paint to fixCJan 2, 2013Mar 19, 2025
3CPeeling lead paint to fixCJan 2, 2013Mar 19, 2025
7EPeeling lead paint to fixCSep 16, 2024Mar 19, 2025
4BPeeling lead paint to fixCSep 24, 2004Mar 4, 2025
4BPeeling lead paint to fixCSep 24, 2004Mar 4, 2025
4BPeeling lead paint to fixCOct 6, 2004Mar 4, 2025
4BPeeling lead paint to fixCOct 6, 2004Mar 4, 2025
4BPeeling lead paint to fixCOct 6, 2004Mar 4, 2025
7EPeeling lead paint to fixCApr 12, 2024Jun 13, 2024
7EPeeling lead paint to fixCApr 12, 2024May 16, 2024
8CPeeling lead paint to fixCApr 28, 2016Aug 29, 2017
8CPeeling lead paint to fixCApr 28, 2016Jun 30, 2016
8CPeeling lead paint to fixCApr 28, 2016Jun 30, 2016
8CPeeling lead paint to fixCApr 28, 2016Jun 30, 2016
8CPeeling lead paint to fixCApr 25, 2016Jun 7, 2016
3CPeeling lead paint to fixCNov 10, 2015Dec 22, 2015
3CPeeling lead paint to fixCNov 12, 2015Dec 22, 2015
3CPeeling lead paint to fixCNov 12, 2015Dec 22, 2015
3CPeeling lead paint to fixCNov 12, 2015Dec 22, 2015
3CPeeling lead paint to fixCNov 12, 2015Dec 22, 2015
7BPeeling lead paint to fixCMar 22, 2010Jun 4, 2013
7BPeeling lead paint to fixCMar 22, 2010Jun 4, 2013
7BPeeling lead paint to fixCMar 22, 2010Jun 4, 2013
3CPeeling lead paint to fixCJan 2, 2013Feb 20, 2013
3CPeeling lead paint to fixCJan 2, 2013Feb 20, 2013

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.