Lead paint content (skip menu)

Lead paint violations at 260 Parkhill Avenue, Staten Island

HPD lists 10 open lead paint violations at this Rosebank-Shore Acres-Park Hill building in Staten Island, under Local Law 1. Each order is set out in plain English, newest first.

open lead paint violations
10
of them class C, immediately hazardous
7
apartments named in open orders, plus 1 building-wide
5
newest lead order issued
Feb 9, 2026
lead orders on record since 2004
48

An order is open while HPD still hasn't accepted a repair, or proof from the owner, for it. Once HPD accepts it, the order is closed. What to do next

Lead orders still open, newest first

All 10 open orders appear below. When one day's order covers several apartments, those apartments share a row, and each one is named.

ApartmentWhat HPD orderedClassWhereIssued
3 apartments6V, 5L, 5CVacant-apartment lead work not proven (order 623)B, hazardousThe whole apartmentFeb 9, 2026
BuildingLead records not handed to HPD (order 620)C, immediately hazardousBuilding paperworkJan 26, 2026
2WPeeling lead paint to fix (order 617)Owner's proof of repair rejectedC, immediately hazardousEast wall in the kitchenMay 8, 2023
4CPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousPlace not named in the orderFeb 16, 2023
4CPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousPlace not named in the orderFeb 16, 2023
4CPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousNorth wall, east wall in the kitchenFeb 16, 2023
4CPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardous2nd closet from north at east wall door frame in the private hallwayFeb 16, 2023
4CPeeling lead paint to fix (order 616)Owner's proof of repair rejectedC, immediately hazardousCeiling, 1st door frame from west at north wall, north wall, south wall, east wall in the bathroomFeb 16, 2023

Unless a row says otherwise, each open order here still reads "notice sent to the owner". For HPD Online, the building ID numbers are BIN 5106237, BBL 5029220001. Open HPD Online

Your next steps

  1. Keep children away from peeling paint. Wash hands, toys, pacifiers, window sills and floors often, and keep children away from rooms where repair work makes dust. Don't sand, scrape or repaint old paint yourself, because that creates lead dust.
  2. Get your child tested. If you think your child was exposed, get a blood lead test from the doctor now. At age 1, and once more at age 2, New York also requires the test. How the test works
  3. Put your complaint in writing. Tell your landlord about the peeling paint, and whether a child under age 6 lives at 260 Parkhill Avenue. Free letters in English and Spanish
  4. Report the problem to HPD. Call 311, or report it online, about peeling paint or repair work that makes dust. Filing is free, and your immigration status doesn't matter.
  5. Child tested high for lead? Follow the doctor's plan for retesting, then talk to a lead paint lawyer about the building's record: call (888) 503-5930.

These lead orders in plain English

Local Law 1 of 2004 is the city's lead paint law, and these orders were issued under it. Lead paint is presumed in buildings built before 1960, and owners get extra duties for apartments where a child under 6 lives.

  • 6 open: peeling lead paint to fix. The paint here contains lead, or is presumed to, and it is peeling or sits on damaged surfaces. Repairing it is the owner's job, using lead-safe work methods.
  • 3 open: vacant-apartment lead work not proven. While the apartment sat empty, the owner had to make its doors, windows and floors lead-safe, then prove that to HPD. The proof isn't there.
  • 1 open: lead records not handed to HPD. The building's lead paint records, covering notices, inspections and repairs, were requested by HPD, but the owner didn't send them within 45 days.

HPD uses class C for a condition that is immediately hazardous. A closed order is one where HPD accepted a repair, or proof from the owner. Of the lead orders here, 38 are closed.

Lead orders here, year by year

  1. 20041
  2. 20062
  3. 20085
  4. 20162
  5. 20175
  6. 20187
  7. 20192
  8. 20211
  9. 20238
  10. 202615
Closed lead orders (38)
ApartmentWhat HPD orderedClassIssuedClosed
6XVacant-apartment lead work not provenBFeb 9, 2026Aug 31, 2026
3EVacant-apartment lead work not provenBFeb 9, 2026Aug 17, 2026
6RVacant-apartment lead work not provenBFeb 9, 2026Aug 14, 2026
4CVacant-apartment lead work not provenCFeb 17, 2023Jul 24, 2026
1LVacant-apartment lead work not provenBFeb 9, 2026Jun 24, 2026
4JVacant-apartment lead work not provenBFeb 9, 2026Jun 24, 2026
6JVacant-apartment lead work not provenBFeb 9, 2026Jun 24, 2026
2BVacant-apartment lead work not provenBFeb 9, 2026Jun 23, 2026
6OVacant-apartment lead work not provenBFeb 9, 2026Jun 23, 2026
3CVacant-apartment lead work not provenBFeb 9, 2026Jun 4, 2026
6AVacant-apartment lead work not provenBFeb 9, 2026Jun 4, 2026
6DVacant-apartment lead work not provenBFeb 9, 2026Jun 4, 2026
1TPeeling lead paint to fixCNov 24, 2023Feb 28, 2024
4CPeeling lead paint to fixCApr 26, 2021Jun 9, 2021
1EPeeling lead paint to fixCSep 27, 2018May 6, 2020
1EPeeling lead paint to fixCSep 27, 2018May 6, 2020
1EPeeling lead paint to fixCSep 27, 2018May 6, 2020
1EPeeling lead paint to fixCSep 27, 2018May 6, 2020
1UPeeling lead paint to fixCDec 22, 2004May 4, 2020
3EPeeling lead paint to fixCMar 30, 2006May 4, 2020
3EPeeling lead paint to fixCMar 30, 2006May 4, 2020
2DPeeling lead paint to fixCSep 2, 2016May 4, 2020
4CPeeling lead paint to fixCMay 10, 2017May 4, 2020
4APeeling lead paint to fixCAug 27, 2019Oct 15, 2019
3WPeeling lead paint to fixCAug 29, 2019Oct 11, 2019
3EPeeling lead paint to fixCAug 17, 2018Oct 22, 2018
3EPeeling lead paint to fixCAug 20, 2018Oct 22, 2018
3BPeeling lead paint to fixCAug 22, 2018Oct 2, 2018
4CPeeling lead paint to fixCDec 14, 2017Mar 27, 2018
4CPeeling lead paint to fixCDec 14, 2017Mar 27, 2018
1BPeeling lead paint to fixCMay 19, 2017Aug 14, 2017
1BPeeling lead paint to fixCMay 19, 2017Aug 14, 2017
5EPeeling lead paint to fixCSep 23, 2008Aug 8, 2017
5EPeeling lead paint to fixCSep 23, 2008Aug 8, 2017
5EPeeling lead paint to fixCSep 23, 2008Aug 8, 2017
5EPeeling lead paint to fixCSep 23, 2008Aug 8, 2017
5EPeeling lead paint to fixCSep 23, 2008Aug 8, 2017
4CPeeling lead paint to fixCAug 25, 2016Sep 14, 2016

A closed order is one where HPD has accepted a repair, or proof from the owner, for it. That doesn't mean the entire building is lead-safe.

Records: HPD's housing violation data, published on NYC Open Data and refreshed monthly; it covers lead paint orders 610 to 626, and the newest lead order anywhere in it is dated October 21, 2026. This page only reads the public record. It is not a medical opinion or a legal finding about the owner.